BCM GRC awarded 3-year extension to their Tier 1 Supplier Framework Agreement with Network Rail

BCM GRC Ltd, Rail Forum member and a leading manufacturer of GRC products or the Construction, Rail and Water industry, today announced that it has been awarded an extension to its Tier 1 framework agreement with Network Rail for the supply of elevated cable route. Starting in September 2023 for a 3 year period this agreement is another major achievement for a UK manufacturer and its employees supplying Network Rail.

When asked about the award, David Lomas, Rail Sales Manager said “As a UK manufacturer now continuing as a Tier 1 supplier, it is reward for the hard work and constant product development we have undertaken over recent years”, adding that “the agreement also gives specifiers and installers confidence to order knowing the products have full Network Rail compliance along with the known benefits of being a cost effective solution to cabling routes in difficult trackside locations.” As suitable for HV cable as it is for Signalling and Telecoms the simple detailing and ease of installation have proven benefits.

Manufactured and stocked in the UK, the BCM GRC elevated troughing system is now the “go to” solution for your elevated troughing requirements whether you are an installer or a designer and is available from BCM GRC Ltd for external purchase or via the NROL system for those within Network Rail.

Benefits

  • Full Network Rail Acceptance for Elevated Trough Route including HV and Signalling
  • Fully Manufactured in the UK so no potential delays and large carbon footprint associated with imported products
  • 2m lengths ,Can be fully loaded with no extra support , lightweight and convenient to transport to site (Will fit on back of a pickup and one person lift)
  • Easy to install – Installation instructions sent with each load
  • Non-Combustible , won’t burn , melt, or give off blue smoke (ideal for tunnels)
  • Electrically Inert
  • UV Resistant -No lids curling
  • Unique lid lock system that means lids wont pop off and can be removed safely on slopes
  • Continuous trough connection , which means troughs can be installed up to 300mm away from centre if required
  • Full range of accessories

For further information please contact David Lomas on 07885 979961 , david.lomas@bcmgrc.com or visit our website www.bcmgrc.com

Share this page: